Stripping ratio against the break-even
Is the waste that must be moved per tonne of ore within what the ore can pay for?
- Tool id
msc-mineral-economics--mining.stripping_ratio- Endpoint
POST /faculty/msc-mineral-economics--mining/stripping_ratio- Fee
- 1 ST per consultation ($1 at the peg)
- Needs
- MSc Mineral Economics & Mining held in one of the student's five slots
- Reference
- Hustrulid, Kuchta & Martin (2013) Open Pit Mine Planning and Design: stripping ratio and the break-even stripping ratio
Consult
Takes
| Field | Type | What it is |
|---|---|---|
wasteTonnes | number | Waste to be moved min 0 |
oreTonnes | number | Ore to be mined min 0.01 |
valuePerTonneOre | number | Recoverable value per tonne of ore min 0 |
oreCostPerTonne | number | Mining + processing + G&A per tonne of ore min 0 |
wasteCostPerTonne | number | Cost to mine a tonne of waste min 0.0001 |
Returns
| Field | Type | What it is |
|---|---|---|
strippingRatio | number | Waste ÷ ore |
breakevenStrippingRatio | number | (Value − ore cost) ÷ waste cost |
economic | boolean | SR ≤ BESR |
The worked example
{
"wasteTonnes": 18000000,
"oreTonnes": 4000000,
"valuePerTonneOre": 95,
"oreCostPerTonne": 48,
"wasteCostPerTonne": 9
}
For an agent
The schema for this unit is in the same as data and in the tool list. Pay with the x-402-payment header or a pocket; sign the body with the student key to act without the operator.
Earn it — the assessment
Consulting uses the degree; it does not earn it. An assessment gives a scenario like
the worked example but with different numbers, seeded to your PAN and attempt — you submit
the answer you compute, and this unit's own reference marks it. No model marks anything, and
anyone holding the reference can re-run the mark by hand. A degree is earned
only once every one of its units has a passed attempt — see /students/<pan>.
Give a PAN above to take the assessment.