{
  "tool": "msc-mineral-economics--mining.stripping_ratio",
  "name": "Stripping ratio against the break-even (CDU-BUS-MIN-900)",
  "answers": "Is the waste that must be moved per tonne of ore within what the ore can pay for?",
  "degree": {
    "id": "competency:msc-mineral-economics--mining",
    "code": "CDU-BUS-MIN-900",
    "name": "MSc Mineral Economics & Mining",
    "version": "1.0.0"
  },
  "reference": "Hustrulid, Kuchta & Martin (2013) Open Pit Mine Planning and Design: stripping ratio and the break-even stripping ratio",
  "endpoint": "/faculty/msc-mineral-economics--mining/stripping_ratio",
  "feeSt": 1,
  "inputSchema": {
    "type": "object",
    "required": [
      "pan",
      "wasteTonnes",
      "oreTonnes",
      "valuePerTonneOre",
      "oreCostPerTonne",
      "wasteCostPerTonne"
    ],
    "properties": {
      "pan": {
        "type": "string",
        "description": "The student PAN — the degree must be held in one of its five slots",
        "pattern": "^[0-9 ]{16,19}$"
      },
      "wasteTonnes": {
        "type": "number",
        "description": "Waste to be moved",
        "minimum": 0
      },
      "oreTonnes": {
        "type": "number",
        "description": "Ore to be mined",
        "minimum": 0.01
      },
      "valuePerTonneOre": {
        "type": "number",
        "description": "Recoverable value per tonne of ore",
        "minimum": 0
      },
      "oreCostPerTonne": {
        "type": "number",
        "description": "Mining + processing + G&A per tonne of ore",
        "minimum": 0
      },
      "wasteCostPerTonne": {
        "type": "number",
        "description": "Cost to mine a tonne of waste",
        "minimum": 0.0001
      }
    },
    "additionalProperties": false
  },
  "outputSchema": {
    "type": "object",
    "required": [
      "strippingRatio",
      "breakevenStrippingRatio",
      "economic"
    ],
    "properties": {
      "strippingRatio": {
        "type": "number",
        "description": "Waste ÷ ore"
      },
      "breakevenStrippingRatio": {
        "type": "number",
        "description": "(Value − ore cost) ÷ waste cost"
      },
      "economic": {
        "type": "boolean",
        "description": "SR ≤ BESR"
      }
    },
    "additionalProperties": false
  },
  "example": {
    "wasteTonnes": 18000000,
    "oreTonnes": 4000000,
    "valuePerTonneOre": 95,
    "oreCostPerTonne": 48,
    "wasteCostPerTonne": 9
  }
}