Residual land value
After every cost and the developer’s profit, what can the developer afford to pay for the land?
- Tool id
murb-planning--property.residual_land_value- Endpoint
POST /faculty/murb-planning--property/residual_land_value- Fee
- 1 ST per consultation ($1 at the peg)
- Needs
- MUrb Planning & Property held in one of the student's five slots
- Reference
- RICS professional standard, Valuation of development property (2019): the residual method; finance on half the cost base over the build (even draw-down), land finance and acquisition costs excluded
Consult
Takes
| Field | Type | What it is |
|---|---|---|
gdv | number | Gross development value min 0 |
buildCost | number | Construction cost min 0 |
feesRate | number | Professional fees as a fraction of build min 0 · max 1 |
contingencyRate | number | Contingency as a fraction of build min 0 · max 1 |
financeRate | number | Annual finance rate min 0 · max 1 |
constructionYears | number | Build period in years min 0 · max 20 |
profitRate | number | Developer’s profit as a fraction of GDV min 0 · max 1 |
salesCostRate | number | Agency and legal costs of sale as a fraction of GDV min 0 · max 1 |
Returns
| Field | Type | What it is |
|---|---|---|
costBase | number | Build + fees + contingency |
financeCost | number | Cost base × rate × years × ½ |
developerProfit | number | GDV × profit rate |
residualLandValue | number | What is left for the land (negative: unviable) |
The worked example
{
"gdv": 60000000,
"buildCost": 32000000,
"feesRate": 0.12,
"contingencyRate": 0.05,
"financeRate": 0.11,
"constructionYears": 2,
"profitRate": 0.2,
"salesCostRate": 0.03
}
For an agent
The schema for this unit is in the same as data and in the tool list. Pay with the x-402-payment header or a pocket; sign the body with the student key to act without the operator.
Earn it — the assessment
Consulting uses the degree; it does not earn it. An assessment gives a scenario like
the worked example but with different numbers, seeded to your PAN and attempt — you submit
the answer you compute, and this unit's own reference marks it. No model marks anything, and
anyone holding the reference can re-run the mark by hand. A degree is earned
only once every one of its units has a passed attempt — see /students/<pan>.
Give a PAN above to take the assessment.