MSc Mineral Economics & Mining
The economic chain from a mineral deposit to a value per tonne: tonnage and contained metal as the codes require them reported, the break-even and marginal cut-off grades, the break-even stripping ratio that bounds an open pit, and the net smelter return per tonne of ore under concentrate terms.
Lineage
- Conquest Designer University, 2026 — authored from the brief and the SAMREC/JORC codes; no prior institution is claimed
Final research project
From block model to value: tonnage, cut-off, stripping and smelter return as one chain
Syllabus
- Reporting: volume, density, tonnage, grade, contained metal (SAMREC 2016; JORC 2012 Table 1)
- Cut-off grade: break-even and marginal cut-offs, recovery, selling costs (Lane; Rendu)
- Open-pit economics: stripping ratio and the break-even stripping ratio
- Revenue: concentrate ratio, payable metal, treatment and refining charges, NSR
Reference
- Tonnage
- volume × dry bulk density
- Contained metal
- tonnes × grade; 1 troy ounce = 31.1034768 g
- Break-even cut-off
- (mining + processing + G&A per tonne) ÷ ((price − selling cost) × recovery)
- Marginal cut-off
- (processing + G&A per tonne) ÷ ((price − selling cost) × recovery)
- BESR
- (recoverable value per tonne of ore − ore cost per tonne) ÷ waste cost per tonne
- NSR
- payable metal × (price − refining charge) − concentrate tonnes × (treatment + transport)
Units
Tonnage and contained metal · Break-even and marginal cut-off grade · Stripping ratio against the break-even · Net smelter return per tonne of ore
Role when narrated: You are a mineral economist and Competent Person explaining a figure in a resource statement or a mine plan. State the basis, show the arithmetic with units, and say which assumption the figure is most sensitive to.
Tonnage and contained metal · resource_tonnage
Try with the exampleHow many tonnes does this volume hold, and how much metal do they contain?
Reference: SAMREC Code (2016) and JORC Code (2012) Table 1: tonnage, grade and contained metal reported together; density on a dry basis
Returns
- tonnes
- Volume × density
- containedMetal
- kg (g/t) or tonnes (%)
- metalUnit
- kg or t
- troyOunces
- For g/t grades; null for %
The example
{
"volume": 2500000,
"density": 2.7,
"grade": 3.2,
"gradeUnit": "g/t"
}
Agents: POST /faculty/msc-mineral-economics--mining/resource_tonnage with JSON {pan, …inputs} and the x-402-payment header. Manifest.
Break-even and marginal cut-off grade · cutoff_grade
Example filled in — consult belowBelow what grade does a tonne of ore not pay for itself — counting mining (break-even), and once already mined (marginal)?
Reference: Lane (1964); Rendu (2014) An Introduction to Cut-off Grade Estimation: break-even and marginal cut-off grades
Returns
- breakevenCutoff
- g/t, all costs
- marginalCutoff
- g/t, excluding mining
The example
{
"miningCost": 35,
"processingCost": 22,
"adminCost": 8,
"pricePerGram": 60,
"sellingCostPerGram": 1.5,
"recovery": 0.92
}
Agents: POST /faculty/msc-mineral-economics--mining/cutoff_grade with JSON {pan, …inputs} and the x-402-payment header. Manifest.
Stripping ratio against the break-even · stripping_ratio
Try with the exampleIs the waste that must be moved per tonne of ore within what the ore can pay for?
Reference: Hustrulid, Kuchta & Martin (2013) Open Pit Mine Planning and Design: stripping ratio and the break-even stripping ratio
Returns
- strippingRatio
- Waste ÷ ore
- breakevenStrippingRatio
- (Value − ore cost) ÷ waste cost
- economic
- SR ≤ BESR
The example
{
"wasteTonnes": 18000000,
"oreTonnes": 4000000,
"valuePerTonneOre": 95,
"oreCostPerTonne": 48,
"wasteCostPerTonne": 9
}
Agents: POST /faculty/msc-mineral-economics--mining/stripping_ratio with JSON {pan, …inputs} and the x-402-payment header. Manifest.
Net smelter return per tonne of ore · nsr_per_tonne
Try with the exampleAfter recovery, payability and smelter charges, what is a tonne of this ore worth at the mine gate?
Reference: Wellmer, Dalheimer & Wagner (2008) Economic Evaluation in Exploration (2nd ed.): net smelter return under concentrate terms
Returns
- concentratePerTonneOre
- Tonnes of concentrate per tonne of ore
- payableMetalPerTonneOre
- Tonnes of payable metal per tonne of ore
- nsrPerTonneOre
- Net smelter return per tonne of ore
The example
{
"headGrade": 0.012,
"recovery": 0.9,
"concentrateGrade": 0.28,
"payable": 0.965,
"pricePerTonneMetal": 9000,
"refiningChargePerTonne": 180,
"treatmentChargePerTonneConc": 80,
"transportPerTonneConc": 60
}
Agents: POST /faculty/msc-mineral-economics--mining/nsr_per_tonne with JSON {pan, …inputs} and the x-402-payment header. Manifest.