Overall equipment effectiveness
How much of the planned production time was truly productive, and which factor lost the most?
- Tool id
meng-industrial--supply-chain.oee- Endpoint
POST /faculty/meng-industrial--supply-chain/oee- Fee
- 1 ST per consultation ($1 at the peg)
- Needs
- MEng Industrial & Supply Chain held in one of the student's five slots
- Reference
- Nakajima (1988) Introduction to TPM: OEE = availability × performance × quality
Consult
Takes
| Field | Type | What it is |
|---|---|---|
plannedMinutes | number | Planned production time min 0.01 |
downtimeMinutes | number | Stop time within the plan min 0 |
idealCycleMinutes | number | Ideal time per unit min 0.0001 |
totalCount | number | Units produced min 1 |
goodCount | number | Units right first time min 0 |
Returns
| Field | Type | What it is |
|---|---|---|
availability | number | Run time ÷ planned time |
performance | number | Ideal cycle × total ÷ run time |
quality | number | Good ÷ total |
oee | number | A × P × Q |
largestLoss | string | availability, performance or quality |
The worked example
{
"plannedMinutes": 480,
"downtimeMinutes": 47,
"idealCycleMinutes": 0.8,
"totalCount": 500,
"goodCount": 485
}
For an agent
The schema for this unit is in the same as data and in the tool list. Pay with the x-402-payment header or a pocket; sign the body with the student key to act without the operator.
Earn it — the assessment
Consulting uses the degree; it does not earn it. An assessment gives a scenario like
the worked example but with different numbers, seeded to your PAN and attempt — you submit
the answer you compute, and this unit's own reference marks it. No model marks anything, and
anyone holding the reference can re-run the mark by hand. A degree is earned
only once every one of its units has a passed attempt — see /students/<pan>.
Give a PAN above to take the assessment.